CONTRACT TITLE
Hamfallow Court deep retrofit project
CONTRACT VALUE
£1.18 Million
DURATION
4 months
COST MODEL
Bespoke Schedule of Rates
Built in 1973, Hamfallow Court is a retirement housing scheme owned by Stroud District Council (SDC) comprising 28 apartments plus communal areas across three buildings. In 2021, the scheme was approved for a Social Housing Decarbonisation Fund (SHDF) Demonstrator grant by the Department for Business, Energy and Industrial Strategy to enhance energy efficiency and reduce cost.
UP TO
50%
REDUCTION IN
HEATING COSTS
UP TO
70%
IMPROVEMENT IN
HEAT LOSS
UP TO
70%
REDUCTION IN
ELECTRICITY COSTS
What our client wanted
Stroud District Council required a PAS2030 accredited partner to deliver ‘deep retrofit’ work throughout the buildings to improve their energy efficiency, reduce their carbon footprint and ultimately cut energy costs for residents.
How we helped
The project included: the installation of Kensa ground source heat pumps in place of existing storage heaters (this required 170 metre deep boreholes); the design and installation of solar photovoltaic panels, Solis hybrid inverters and a Puredrive Energy smart battery storage solution; and the installation of Thermabead cavity wall insulation, draught proofing and loft insulation.
The technology also enables SDC to monitor the systems remotely to ensure they are operating correctly.
What we achieved
The project is forecast to enable heating cost savings of up to 50%, a heating loss reduction of up to 70% and is predicted to reduce electricity bills at Hamfallow Court by up to 70%.
Throughout the project, MD Group were informative, kept us updated on progress daily and even rose to the challenge when some design elements changed due to complications. The project taught us all new skills, which I am sure MD Group will take forward to any project they are involved in.